Without months of messy construction—thanks to their pre-moulded structure and efficient installation process, our fibreglass pools can be fully installed and swim-ready in as little as one week.
Here’s a simple breakdown of how it all works...
The ground is excavated to match the shape and size of your selected fibreglass pool shell—laying the foundation for summer-ready relaxation!
A 10cm bed of gravel is laid and levelled to support the pool shell and ensure accurate positioning — no concrete required.
The pre-formed fibreglass pool shell is delivered and carefully lowered into place using our telescopic vehicle crane. Once in position, it’s ready for plumbing, backfilling, and filling with water.
As backfilling with gravel begins, the filtration system and any additional features—such as salt chlorinators, electric cover control panels etc are all connected.
A concrete ring beam is poured around the top edge of the pool, locking it securely in place and providing structural reinforcement.
The final touches — margelles, decking, or landscaping—are completed according to the chosen design, bringing the pool area to life!